Bank Birmingham Towers One & Two, Birmingham, UK - Construction with Community

Follow here with ItsYourBuild, the residential Bank Birmingham Development, Broad Street, Birmingham. 

What we found out

What difference has it made

Passions

Construction & regeneration

Project dates

17 Aug 2017 - On-going

Contact (for more details)

Jonathan Bostock

0121 410 5520
jonathan.bostock@ freetimepays.com

Construction & regeneration
24 Nov 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - November 2019

Bank Tower Two is complete with just the fitout of the ground level retail spaces to go. A dull misty day for these photos but some interesting perspectives and angles.

Related

The Construction of Bank Tower Two - November 2019





Bank Tower Two is complete with just the fitout of the ground level retail spaces to go. A dull misty day for these photos but some interesting perspectives and angles.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
11 Oct 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - September/October 2019

Here's a gallery of photos from September and October so far of the construction of Bank Birmingham Tower Two, with lots of different lighting conditions.

Related

The Construction of Bank Tower Two - September/October 2019





Here's a gallery of photos from September and October so far of the construction of Bank Birmingham Tower Two, with lots of different lighting conditions.


Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
29 Aug 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - August 2019

The new strip lights on the top of Bank Tower Two were shining a lovely turquoise for a couple of days. Here are some more shots as well as some of the tower reflecting the sunset and a coulple taken from Digbeth.

Related

The Construction of Bank Tower Two - August 2019





The new strip lights on the top of Bank Tower Two were shining a lovely turquoise for a couple of days. Here are some more shots as well as some of the tower reflecting the sunset and a coulple taken from Digbeth.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
20 Aug 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - August 2019

Bank Tower Two is nearing external completion with most of the cladding now installed. Here's the latest construction photo gallery.

Related

The Construction of Bank Tower Two - August 2019





Bank Tower Two is nearing external completion with most of the cladding now installed. Here's the latest construction photo gallery.


Photography by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
07 Aug 2019 - Daniel Sturley
News & Updates

The Construction of Bank Tower Two - August 2019

There has been a great addition to the Birmingham city skyline with coloured lights installed on the top of Bank Tower Two on Broad Street!

Related

The Construction of Bank Tower Two - August 2019





There has been a great addition to the Birmingham city skyline with coloured lights installed on the top of Bank Tower Two on Broad Street!


Photography by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
12 Jul 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - July 2019

Bank Tower Two is very close to fully clad now with the external lifts on the west side removed. Great colours in the sunlight contrasting with Tower One's more bronze and gold exterior.

Related

The Construction of Bank Tower Two - July 2019





Bank Tower Two is very close to fully clad now with the external lifts on the west side removed. Great colours in the sunlight contrasting with Tower One's more bronze and gold exterior.


Photography by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
25 Jun 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - June 2019

Bank Tower Two is nearing external completion with most of the cladding now installed, construction update photos in this post and some from the 'Sky High Birmingham' visit to the top at the invitation of Wates Group.

Related

The Construction of Bank Tower Two - June 2019





Bank Tower Two is nearing external completion with most of the cladding now installed, construction update photos in this post and some from the 'Sky High Birmingham' visit to the top at the invitation of Wates Group.


Photography by Daniel Sturley

 

Photography by Stephen Giles

 

Photography by Karl Newton

'Sky High' Birmingham visit to the top of Bank Tower Two...

 

 

Share  Connect with us
80 passion points
Construction & regeneration
17 Jun 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - June 2019

The West Side of Bank Tower Two is finished externally and the external lifts are being dismantled.

Related

The Construction of Bank Tower Two - June 2019





The West Side of Bank Tower Two is finished externally and the external lifts are being dismantled.


Photography by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
06 Jun 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - June 2019

Some of the cladding has been installed to the top and is starting to show how the tower will reflect the sunlight, the top two floors having more stripes than the rest and are larger, higher floors.

Related

The Construction of Bank Tower Two - June 2019





Some of the cladding has been installed to the top and is starting to show how the tower will reflect the sunlight, the top two floors having more stripes than the rest and are larger, higher floors.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
29 May 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - May 2019

Bank Tower Two is having the last of the cladding installed and we look forward to the removal of the external lifts to get the full effect.

Related

The Construction of Bank Tower Two - May 2019





Bank Tower Two is having the last of the cladding installed and we look forward to the removal of the external lifts to get the full effect.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
19 May 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - May 2019

The cladding is approaching completion and is really starting to catch the light, many more photos from various perspectives in this gallery, including from our recent trip to the top of the Rotunda thanks to Staying Cool.

Related

The Construction of Bank Tower Two - May 2019





The cladding is approaching completion and is really starting to catch the light, many more photos from various perspectives in this gallery, including from our recent trip to the top of the Rotunda thanks to Staying Cool.


Photos by Stephen Giles

 

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
21 Apr 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - April 2019

Bank Tower Two is getting close to external completion, lots of the cladding is now visable on all sides, reflecting the spring sunlight.

Related

The Construction of Bank Tower Two - April 2019





Bank Tower Two is getting close to external completion, lots of the cladding is now visable on all sides, reflecting the spring sunlight.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
07 Apr 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - April 2019

There has been much more cladding installed and a lot has been revealled showing the striking grey/bronze colours. Lots of photos in this construction update.

Photo by Tom Grunt 

Related

The Construction of Bank Tower Two - April 2019





There has been much more cladding installed and a lot has been revealled showing the striking grey/bronze colours. Lots of photos in this construction update.

Photo by Tom Grunt 


Photo by Tom Grunt

Photo by Stephen Giles

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
30 Mar 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - March 2019

The focus of construction at Bank Birmingham is now on the cladding of Tower Two as the crane is now removed, lots more is revealed and the windows on one corner are installed to the top.

Related

The Construction of Bank Tower Two - March 2019





The focus of construction at Bank Birmingham is now on the cladding of Tower Two as the crane is now removed, lots more is revealed and the windows on one corner are installed to the top.


Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
09 Mar 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - March 2019

Leftbank Tower Two is dominating the westside and can be seen from lots of areas and angles, here from the Mailbox. The external lifts have been extended to the top for the rest of the cladding to be installed.

Related

The Construction of Bank Tower Two - March 2019





Leftbank Tower Two is dominating the westside and can be seen from lots of areas and angles, here from the Mailbox. The external lifts have been extended to the top for the rest of the cladding to be installed.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
25 Feb 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - February 2019

The final piece of slip-form has been removed from the top of the structurally complete Leftbank Tower Two and the cladding is chasing up fast, the tower is really showing how it will catch the sunlight now.

Related

The Construction of Bank Tower Two - February 2019





The final piece of slip-form has been removed from the top of the structurally complete Leftbank Tower Two and the cladding is chasing up fast, the tower is really showing how it will catch the sunlight now.


Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
03 Feb 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - February 2019

Bank Tower Two at the Leftbank development is now structurally complete, a beautiful day for this photo update, more in the full post.

Related

The Construction of Bank Tower Two - February 2019





Bank Tower Two at the Leftbank development is now structurally complete, a beautiful day for this photo update, more in the full post.


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
31 Jan 2019 - FreeTimePays
Gallery

Wow! What a view across Birmingham (and then some) from the top of Bank Tower Two

Daniel Sturley, a Birmingham community photographer and one of the City's incredibly talented and inspired 'People with Passion', was invited by Wates to the topping out ceremony at Bank Tower Two in Birmingham to take some skyline photography.

Just take a look at the view from up there!  What a brilliant gallery of photography!

Related

Wow! What a view across Birmingham (and then some) from the top of Bank Tower Two





Daniel Sturley, a Birmingham community photographer and one of the City's incredibly talented and inspired 'People with Passion', was invited by Wates to the topping out ceremony at Bank Tower Two in Birmingham to take some skyline photography.

Just take a look at the view from up there!  What a brilliant gallery of photography!


All photography by community photographer Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
24 Jan 2019 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - January 2019

Bank Tower Two on Broad Street is now structurally complete with the cladding chasing up behind fast.

Related

The Construction of Bank Tower Two - January 2019





Bank Tower Two on Broad Street is now structurally complete with the cladding chasing up behind fast.


 

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
26 Dec 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - December 2018

Wates Group's Bank Tower Two is now completing the final floor, the top two stories being higher floors that are now clearly visible. Many photos in this update covering 16th and 22nd December.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two - December 2018





Wates Group's Bank Tower Two is now completing the final floor, the top two stories being higher floors that are now clearly visible. Many photos in this update covering 16th and 22nd December.

Photo by Daniel Sturley


Photos by Daniel Sturley

Check out this great map of Birmingham development and contruction projects:

Greater Birmingham Developments

Courtesy: @GtrBhamDev

Share  Connect with us
80 passion points
Construction & regeneration
09 Dec 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two - December 2018

Some nice festive tones in the lighting conditions for this update with the tower just shy of topping out. See more photos in the full post.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two - December 2018





Some nice festive tones in the lighting conditions for this update with the tower just shy of topping out. See more photos in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
22 Nov 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The main structure of Bank Tower Two on Broad Street is just a floor short of topping out, it looks great on the skyline at the moment all lit up with temporary lighting. A big gallery of photos in this update.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





The main structure of Bank Tower Two on Broad Street is just a floor short of topping out, it looks great on the skyline at the moment all lit up with temporary lighting. A big gallery of photos in this update.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
29 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
21 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
07 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

It looks like another big chunk of cladding is ready to be revealed and the main structure is nearing the last few floors. Lots of photos in this update, view them in the full post.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





It looks like another big chunk of cladding is ready to be revealed and the main structure is nearing the last few floors. Lots of photos in this update, view them in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
21 Sep 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Progress update in photos of the 32 floor Bank Tower Two on Broad Street, now up to the 25th floor on the main structure.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





Progress update in photos of the 32 floor Bank Tower Two on Broad Street, now up to the 25th floor on the main structure.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
27 Aug 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

As Bank Tower Two continues to fly up the focus in this update is on the cladding as it goes on around the lower floors, now really showing how it will catch the light.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





As Bank Tower Two continues to fly up the focus in this update is on the cladding as it goes on around the lower floors, now really showing how it will catch the light.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
20 Aug 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two is up to the 23rd floor with its main structure and there are several large areas at the base of the tower now fully clad, can't wait to see some photos of this in the sunshine. Lots of photos in this update.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two is up to the 23rd floor with its main structure and there are several large areas at the base of the tower now fully clad, can't wait to see some photos of this in the sunshine. Lots of photos in this update.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
05 Aug 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two has powered past it's older sibling now at the 23rd floor and the final cladding is ready to install on the lower floors. 14 photos in this update for the end of July and the start of August.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two has powered past it's older sibling now at the 23rd floor and the final cladding is ready to install on the lower floors. 14 photos in this update for the end of July and the start of August.

Photos by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
18 Jul 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Another great sunny day for this update, the main structure is at the 21st floor and the lower floors are ready for the final cladding panels to be revealed.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Another great sunny day for this update, the main structure is at the 21st floor and the lower floors are ready for the final cladding panels to be revealed.

Photos by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
13 Jul 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two's main structure is almost up to it's sibling Tower One and the cladding on the lower floors are almost ready for the final layer. A beautiful sunny day for the main photos in this update.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two's main structure is almost up to it's sibling Tower One and the cladding on the lower floors are almost ready for the final layer. A beautiful sunny day for the main photos in this update.

Photos by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
13 Jul 2018 - Daniel Sturley
Inspiration

Bank Tower Two on the Birmingham City Skyline from Clent Hills

This shot is from Clent Hills on the 7th July 2018. The Birmingham skline is constantly changing, in this shot we can see how Bank Tower Two on Broad Street will dominate the central cluster from a western viewpoint. More in BT2's update shortly.

Photo by Daniel Sturley

Related

Share  Connect with us
50 passion points
Construction & regeneration
03 Jul 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Here's the last June update, a little late but some nice perspectives of the building.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Here's the last June update, a little late but some nice perspectives of the building.

Photos by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
10 Jun 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two continues to rise with seemingly increasing pace now. A few from different perspectives for this update, here from the Library of Birmingham, some from Five Ways Park.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two continues to rise with seemingly increasing pace now. A few from different perspectives for this update, here from the Library of Birmingham, some from Five Ways Park.

Photos by Daniel Sturley


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
05 Jun 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two on Broad Street in Birmingham is becoming the dominant feature in the westside with the main structure up to the 16th floor and many more windows on the lower floors.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two on Broad Street in Birmingham is becoming the dominant feature in the westside with the main structure up to the 16th floor and many more windows on the lower floors.

Photos by Daniel Sturley


 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
03 Jun 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

A week late on this photo update but well worth a look, there has been much more sub-cladding and window installation on the lower floors and signs of the street level areas being prepared for retail and food outlets. Photos from 26th May.

Photos by Daniel Sturley

Related

The Construction of Bank Tower Two





A week late on this photo update but well worth a look, there has been much more sub-cladding and window installation on the lower floors and signs of the street level areas being prepared for retail and food outlets. Photos from 26th May.

Photos by Daniel Sturley


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
09 May 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The core has gone up to the 33rd floor and the main structure continues to rise at Bank Tower Two, it was a sunny day for the main photos in this update.

Related

The Construction of Bank Tower Two





The core has gone up to the 33rd floor and the main structure continues to rise at Bank Tower Two, it was a sunny day for the main photos in this update.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Photography
21 Apr 2018 - Daniel Sturley
Inspiration

Using Different Lenses in Photography

Here are three photos taken with three different lenses of the construction of Bank Tower Two on Broad Street as part of the Left Bank development. Click 'View Article' to see the photos, descriptions and tips.

Related

Using Different Lenses in Photography





Here are three photos taken with three different lenses of the construction of Bank Tower Two on Broad Street as part of the Left Bank development. Click 'View Article' to see the photos, descriptions and tips.


These were taken just before sunset, using a Canon 60D hand held with ISO 400 film speed.

18-55mm zoom lens at 18mm, 1/125th second exposure, F/8

This is the widest end of the lens and does produce a little distortion.

 

28-80mm zoom lens at 80mm, 1/200th second exposure, F/8

I always like to fire off several captures because I find that a tiny camera shake can defocus the image and I can never tell properly till I see it on my laptop.

 

70-300mm zoom lens at 228mm, 1/1000th second exposure, F/5.6.

I definitely needed to fire off a few to make sure that I got this sharp (it's pin sharp on the 18mpx master too). The lens produces a sever magenta flare in the shadows adjacent to super reflective edges, most consumer lens have this effect due to the minute tint in the lens glass and can often be red to even green. I removed most of it in Photoshop Elements by reducing the saturation on only the magenta channel and if did not really effect the rest of the photo. It can still be seen but is much better.

Photography by Daniel Sturley 

Share  Connect with us
60 passion points
Construction & regeneration
08 Apr 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The main structure is continuing with safety cladding added as it rises to the 12th floor. Click 'View Article' to see more photos.

Related

The Construction of Bank Tower Two





The main structure is continuing with safety cladding added as it rises to the 12th floor. Click 'View Article' to see more photos.


 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
43 passion points
Construction & regeneration
18 Mar 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The core for Bank Tower Two has stalled at the 29th floor due to high winds and adverse weather but the main structure is continuing, now up to the 10th floor. Click 'View Article' to see the rest of the photos.

Related

The Construction of Bank Tower Two





The core for Bank Tower Two has stalled at the 29th floor due to high winds and adverse weather but the main structure is continuing, now up to the 10th floor. Click 'View Article' to see the rest of the photos.


 

The core is now visible from Central Square in Brindkeyplace.

 

 

 

 

From the Library of Birmingham.

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
43 passion points
Construction & regeneration
05 Mar 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

A freezing and foggy day in the aftermath of the 'Beast from the East' and Storm Emma was the backdrop for this construction update of Bank Tower Two at the Left Bank development on Broad Street in Birmingham. The photos still help to give an impression of the looming bulk of the tower as it rises to the eighth floor with the core at 30. Click 'View Article' to see the rest of the photos.

Related

The Construction of Bank Tower Two





A freezing and foggy day in the aftermath of the 'Beast from the East' and Storm Emma was the backdrop for this construction update of Bank Tower Two at the Left Bank development on Broad Street in Birmingham. The photos still help to give an impression of the looming bulk of the tower as it rises to the eighth floor with the core at 30. Click 'View Article' to see the rest of the photos.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
56 passion points
Construction & regeneration
26 Feb 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two continues to rise, here is a gallery of photos from the weekend, including a few taken from a distance showing the effect it is having on the skyline. Click 'View Article' to see the rest.

Related

The Construction of Bank Tower Two





Bank Tower Two continues to rise, here is a gallery of photos from the weekend, including a few taken from a distance showing the effect it is having on the skyline. Click 'View Article' to see the rest.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
24 Feb 2018 - Daniel Sturley
News & Updates

The Construction of Bank Tower Two

The core for Bank Tower Two is at the 29th floor and the main structure up to the 7th, now taller than the Bank building on the Broad Street side of the site. More photos of the progress to follow soon.

Related

Share  Connect with us
55 passion points
Construction & regeneration
16 Feb 2018 - Daniel Sturley
News & Updates

The Construction of Bank Tower Two

Bank Tower Two at Leftbank on Broad Street has it's core up to the 28th floor now.

Related

Share  Connect with us
55 passion points
Construction & regeneration
27 Jan 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The core of Bank Tower Two  is now well past Tower One at the 25th floor and is starting to dominate the westside from many angles. Click 'View Article' to see a gallery of recent photos.

Related

The Construction of Bank Tower Two





The core of Bank Tower Two  is now well past Tower One at the 25th floor and is starting to dominate the westside from many angles. Click 'View Article' to see a gallery of recent photos.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
20 Jan 2018 - Daniel Sturley
News & Updates

The Construction of Bank Tower Two

The weather is terrible but here's a photo of the concrete core for Bank Tower Two which is now at the 22nd floor.

Related

Share  Connect with us
65 passion points
Construction & regeneration
14 Jan 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The core for Bank Tower Two powers past it's shorter sibling and becomes visible from loads of vantage points around the city. Click 'View Article' to view a gallery of photos from this massive build.

Related

The Construction of Bank Tower Two





The core for Bank Tower Two powers past it's shorter sibling and becomes visible from loads of vantage points around the city. Click 'View Article' to view a gallery of photos from this massive build.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
07 Jan 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The concrete core for Bank Tower Two is up to the 18th floor, soon to be level with Tower One. The main structure is progressing well with the lower floors well into construction. Click 'View Article' to see some more photos.

Related

The Construction of Bank Tower Two





The concrete core for Bank Tower Two is up to the 18th floor, soon to be level with Tower One. The main structure is progressing well with the lower floors well into construction. Click 'View Article' to see some more photos.


 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
23 Dec 2017 - Daniel Sturley
News & Updates

Bank Tower Two Hits the City Skyline

Seen here from the 'Secret Garden' atop the Library of Birmingham, the core for Bank Tower Two is about half way up and will soon rise above Tower One. More recent photos to come.

Related

Share  Connect with us
50 passion points
Construction & regeneration
10 Dec 2017 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The core for Bank Tower Two is up to the 11th floor and the main structure is chasing behind, moving really quickly this construction, it will soon be on the skyline. Click 'View Article' to see some more photos.

Related

The Construction of Bank Tower Two





The core for Bank Tower Two is up to the 11th floor and the main structure is chasing behind, moving really quickly this construction, it will soon be on the skyline. Click 'View Article' to see some more photos.


 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
53 passion points
Construction & regeneration
04 Nov 2017 - Daniel Sturley
News & Updates

Bank Tower Two Crane Installation

The rest of the crane for the construction of Bank Tower Two on Broad Street is being installed this weekend. Click 'View Article' to see more photos from today.

Related

Bank Tower Two Crane Installation





The rest of the crane for the construction of Bank Tower Two on Broad Street is being installed this weekend. Click 'View Article' to see more photos from today.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
5 passion points
Construction & regeneration
28 Oct 2017 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two starts to rise and will quickly speed up now that the lower structure is well on the way. It is becoming clearer why there are no windows on the side of Tower One adjacent to Tower Two, they will be very close at this corner! Click 'View Article' to see some more photos.

Related

The Construction of Bank Tower Two





Bank Tower Two starts to rise and will quickly speed up now that the lower structure is well on the way. It is becoming clearer why there are no windows on the side of Tower One adjacent to Tower Two, they will be very close at this corner! Click 'View Article' to see some more photos.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
3 passion points
Construction & regeneration
23 Oct 2017 - Daniel Sturley
News & Updates

Bank Tower One Almost Complete

Bank Tower One is almost externally complete with the last few floors of cladding going on, seen here from Broad Street near the Hyatt Hotel where it really dominates, untill Tower Two goes up that is!

Related

Share  Connect with us
0 passion points
Construction & regeneration
23 Oct 2017 - Daniel Sturley
News & Updates

Bank Tower Two Starts to Rise

The first parts of Bank Tower Two have risen up above the site hordings, 31 floors to go!

Related

Share  Connect with us
0 passion points
Construction & regeneration
12 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Bank Tower One

Bank Tower One is starting to look dazzling in the low autumn sun, the cladding is moving onto the final floors and the part-installed crane for Tower Two has been tethered to the top. Click 'View Article' below to see some more photos.

Related

The Construction of Bank Tower One





Bank Tower One is starting to look dazzling in the low autumn sun, the cladding is moving onto the final floors and the part-installed crane for Tower Two has been tethered to the top. Click 'View Article' below to see some more photos.


 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
5 passion points
Construction & regeneration
08 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Bank Tower Two

With Bank Tower One nearly fully clad a crane is being installed for the constuction of Bank Tower Two. Click 'View Article' below to see some more photos of Tower One.

Related

The Construction of Bank Tower Two





With Bank Tower One nearly fully clad a crane is being installed for the constuction of Bank Tower Two. Click 'View Article' below to see some more photos of Tower One.


 

 

 

 

 

 

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
0 passion points
Construction & regeneration
07 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Bank Tower One

Bank Tower One reflected in the black windows of the Novotel opposite, the amazing gold and bronze cladding is nearing completion. Click 'View Article' below to see some more photos from this build.

Related

The Construction of Bank Tower One





Bank Tower One reflected in the black windows of the Novotel opposite, the amazing gold and bronze cladding is nearing completion. Click 'View Article' below to see some more photos from this build.


 

 

 

 

 

 

 

 

 

 

 

One extra photo from the city centre at sunset showing how the structure dominates the westside city skyline, we can't wait for Bank Tower Two!

 

 

 

 

 

 

Photos by Daniel Sturley

Share  Connect with us
0 passion points
Photography
08 Sep 2017 - FreeTimePays
Gallery

Wates builds em high in Birmingham!

Birmingham Wow! What a view of the city from the top of Bank Tower 1 on Broad Street taken during the topping out ceremony of this Wates construction.

Related

Share  Connect with us
3 passion points