BEORMA TOWER, PHASE II
Land at Park Street, Allison Street and Well Lane
Digbeth, Birmingham, B5 6DR
View the site map HERE.
PROJECT TEAM:
Developer: Salhia
Architect(s), Designers: Broadway Malyan, LBD
Project Manager, Quantity Surveyor, Health & Safety: Gleeds
Principal Designer: MDA Consulting; Andrew Goddard Associates
Civil & Structural Engineer/ Geotechnical Engineer: Walsh
M&E: Ark M&E (JRL Group); Futureserv
Facade: McMullen Facades (JRL); ASFD Ltd (JRL); Wintech
Principal Contractor: Midgard (JRL Group)
Planning Consultant: Alistair Grills Associates
Planning Application Number: 2020/10216/PA
Targeted Completion: 2026
BEORMA TOWER, PHASE II
Phase II of Beorma Quarter is underway with the delivery of a 30-storey mixed-use tower (113m).
The tower will introduce 124 all-electric homes, accommodating 60 one-, 45 two-, & 19 three-bedroom homes (2-4 & 6 persons; 50-153sqm), benefiting from two fire-compliant staircases, and complemented by 152K SF of commercial.
With the basement providing all-electric heating to the homes, the tower – designed with an Angolan black granite base with profiled aluminium cladding to the podium & high-performance curtain walling – will deliver 10 floors of offices, punctuated by a plant room, with 17 floors of homes thereafter.
Resident facilities include a cinema room, a 28th-floor gymnasium, and 29th-floor penthouses with wintergarden terraces.
135-137 & the 1930s frontage of 138-139 Digbeth High Street will be integrated into the design.
Beorma Quarter, images from Salhia/ Gleeds/ Broadway Malyan.
BEORMA QUARTER, PHASE II - UNDER CONSTRUCTION
March 2024 -
February -
Images by Stephen Giles.
Images by Alan Webb
January -
Photography by Daniel Sturley.
Images courtesy Alan Webb.
December 2023 -
Images from Stephen Giles.
November 2023 -
Images from Alan Webb.